Marine Railway and Graving Dock
The works constructed in 1836-37 were primitive
consisting of a rough and ready marine railway track and capstan powered by horse. In
1838-39 a stone engine house and additional two-storey building had been erected. The
existence of a rudimentary dry dock cum building slip is mentioned by Lt.
Colonel Bonnycastle in 1838 during the abortive 'Patriot Invasion' and the occupation of
the Marine Railway property by British troops]. A Royal Engineers plan dating to 23 April
1838 shows the Marine Railway Company property in detail: the steam powered marine railway
with engine house is located running along the property line and parallel to Lower Union
Street, with a stone Engine House at its landside end. Part of the battery rampart to the
north, had been removed and a shipbuilding slip had been excavated in the midst of the old
battery with a dry dock forming part of the slip; this does not seem to be a full graving
dock in the modern sense but simply a trench to facilitate shipbuilding; two ships are
depicted on the railway and one under construction in the slip. A second plan (at
smaller scale) dating to 1939 shows the marine railway, an extensive wharf to the
immediate south, a foundry (the Ontario Foundry) and a slip or dry dock to the
north, cutting through the old battery rampart as before but drawn as open to the water.
The company launched its first ship the steamer Gildersleeve in that year, and
later in 1839 built three gunboats for the Royal Navy.
The Marine Railway Company as originally
constituted continued in operation from 1836 to 1862. Its heyday would seem to have been
the 1840s and early 1850s with many vessels repaired and built under the supervision of
shipwright Henry Thurston. In 1853, in an effort to raise capital, the company mortgaged
its property by Deed Trust to local lawyer (later Senator) Sir Alexander Campbell. The
national depression of 1857 broke the back of the company, it defaulted on its mortgage
and in chancery court Campbell gained control of the property and assets. In 1862 the
Marine Railway Company became defunct. Campbell sold the property in 1863 to local
shipbuilder John Carruthers for $50,000. The records show that Carruthers, in conjunction
with C.W. Jenkins, built four vessels in 1868 and 1869 Annandale, Rose, Shamrock,
and Thistle - these presumably at the old Marine Railway shipyard
In 1872 Carruthers sold the shipyard and marine
railway to William Power. He operated profitably for thirteen years; between 1872 and 1878
building many of Kingston's best known vessels: Africa, A.G. Ryan, Bangalore, Bedford,
Ceres, China, Cuba, Elm, F.A. Folger, Hyderabad, Maid of Erin, Marquis of Lorne, Ox,
Pierrepont, Portsmouth, Rideau, Singapore, and Where Now. William Power was the first
to attempt constructing a proper graving dock onsite, and although according to engineer
Henry Perley it was never operational and had to be razed, it is depicted on a plan drawn
up by Canada Public Works draughtsman Eugene LaFleur in 1881.
Sold Back to the Government
By 1885 William Power was aging [64 yrs], he was
losing repair business to Oswego shipyard and no doubt the attempted renovation and
expansion of the shipyard facilities had drained his capital resources; he quit-claimed
the yard back to John Carruthers, who had evidently been financing him. In 1888 Carruthers
sold the property back to the Crown for $19,500. As early as 1880 the issue of the need
for a graving dock on the Great Lakes was raised due to the fact that marine railways were
incapable with dealing with the most recent large vessels and their repairs had to be done
at graving docks in the United States with a consequent loss of revenue to Canadian
business. In 1889 the federal government decided to make use of its newly acquired
waterfront by building a state of the art dry dock. At the time there were only
three dry docks in existence in the country: Halifax, Quebec City, and Esquimalt - there
were no Canadian graving docks serving the Great Lakes.
William Power's failed attempt to privately
undertake the construction of an expensive graving dock may have intrigued some
politicians in Ottawa - political intrigue on the part of the Conservative Minister of
Public Works, Hector Langevin, certainly was a factor in its construction. The site was no
doubt chosen partly because it was in the Prime Minister's, Sir John A. Macdonalds
constituency, but as well many of the largest shipping and forwarding concerns on the
Canadian Great Lakes were located there - Richardson Grain Forwarders and Montreal
Transportation Company. Another factor was the proximity of the prosperous Oswego dry dock
had a monopoly on lower lakes repairs at the time.
The Dry-dock
Civil engineer Henry Perley drew up the plans and
specifications and the contract for construction was awarded to the Connolly Brothers. The
contractors heavily subsidized the Conservative party election in 1890 and although the
15th highest bidder out of 19 tenders, got the contract to build the dry dock. They won
the contract under suspicious circumstances and their bid of $260,000 was one of the
highest. With extras, including the revised widening of the whole dock from 48 to 55 feet
their bill eventually rose to $344,276.
Perley's article published in the Transactions
of the Civil Engineers of Canada 1896 gives the best overview of the dry dock's
original design and construction: details of the pumping plant and engine house fell to
others. The basic dimensions of the dry dock were based upon the breadth and depth of the
Welland Canal which connected the upper and lower lakes - 79 feet wide at grade or coping
level, 48 feet wide at the water line (later revised to 55 ft to accommodate the then largest
steamer) and sloping inward to 47 feet in width at the bed, 280 ft long and with an
operational depth of 15 ft 6in or 22 feet from the top of the coping. An entrance apron
extending 20 feet beyond the caisson or iron gate was constructed and upon which the
caisson could be situated, thus allowing the dry dock to accommodate a vessel of 310 ft in
length.
The bulk of the material used for the dock bed
and sidewalls was limestone quarried in Belleville Ontario; this was worked into ashlar
stones 2 ft 8 in high by four ft long, each stone averaging 3 tons in weight. The central
6 feet of the bed carried the cast iron keel blocks at 5 foot intervals. A rudder well 24
feet long was located at the lake end of the dock to facilitate replacement of rudders and
propellers - common repair work. The quoins or corner stones of the dock were of granite.
Underneath the foundation of the dock bed was a system of arterial drains to carry off
leakage in from the lake via the auxiliary pump.
The dock was closed by an iron caisson or gate
which moved on rollers, powered into position by a yoke connected to the auxiliary pump
engine. The dock was emptied by 22 inch discharge pipes connected to two 18 inch
centrifugal pumps, they in turn powered by two high pressure vertical steam engines
located within the engine house approximately 13 feet below ground level. Within the
engine room a three tone gantry crane ran overhead. The engines were served by four 14
foot cylindrical boilers located in the adjacent boiler room, identified by the imposing
90 foot chimney. Perley concludes his description with a performance rating. The dock held
2,100,000 gallons of water which could be discharged in 75 minutes. Upon opening a valve
to a inlet culvert the dock could be filled (to gently re-float a repaired vessel) in 55
minutes.
Perley remarked that a large portion of the dry
dock property in 1892 was manmade, using earth and stone from the excavation of the
graving dock. His costing of the project was broken down thus: property $20,000; graving
dock $365,000; pumps and engines $26,000; stone engine house $26,000; gate $18,000; and
engineering and extras $42,000, for a total of $497,000.
Between 1891 and 1908 the dry dock was owned and
administered by the Department of Public Works but details of its operation remain open to
question. A dynamo room and coal sheds had been added to the premises in 1892 but few if
any other repair shops or facilities appear to have been erected. The Kingston City
Directory 1906 lists merely the Canada Dry Dock Office onsite. However between
December 1891 and April 1894, 93 vessels entered the dock for repair, they included a
mixture of sail and steamships, but it is of note that all were wooden hulls. Whether the
government hired private jobbers on a single contract basis; whether the dry dock was
leased for a set period to a ship repair company; or whether the ship owners were
responsible for the repairs themselves is still an open question.
The Dry-dock Leased
In 1908 a more stable arrangement was established
whereby the newly formed Kingston Shipbuilding Company (a subsidiary of Collingwood
Shipyards) leased the dry dock, engine house and administration building on a 'bare boat'
basis whereby the company provided all tools, materials, and manpower. The company erected
much needed additional facilities on the lease land and surrounding property, allowing it
to deal with iron hulls and to effectively build as well as repair vessels (first new
build was the Polana in 1911). Over time the site became de facto the
Kingston Shipbuilding Company shipyard and the government's jurisdiction and interest in
the property lapsed into that of a mere landlord.
During the Great Depression the yard was bought
up by R.M. Wolvin becoming part of his shipbuilding conglomerate Canadian Shipbuilding and
Engineering. In 1929 efforts were underway to extend the dry dock. An
as-built plan dating
to June 1930 shows the lengthening to the landside end of the structure. The addition was
of reinforced concrete, 92 feet long 67 wide at ground level, with other dimensions
matching existing. The new overall length being approximately 372 ft. This extension
served well during the Depression when repair work kept the shipyard alive and most
vessels were tugs and 250
ft canalers.
Post War Years
When CS&E amalgamated with Canada Steamship
Lines in 1947 the yard gained a sinecure on the repair of CSL's large fleet of
canalers
which wintered at Kingston. This situation provided prosperity until 1959 when the St.
Lawrence Seaway opened; 750 foot maximum Seaway vessels quickly overran the Great Lakes
rendering the canalers obsolete and they soon disappeared from the commercial shipping
scene. As early as 1953 the management of Kingston Shipyards was anticipating the
consequences of the Seaway and was planning for another rebuilding of the graving dock].
Kingston Shipyards was always the 'poor cousin' within the CS&E establishment and
Manager R.W. Sutton realized that little money would be forthcoming from his own
corporation for such a massive undertaking at Kingston. In 1958 he began lobbying
independently for support in order to save 'his' yard. With the support of many of the
Canadian shipping companies, including Paterson, Hall Co, and Misener, (whose position was
that a dry dock east of Port Weller would help them by providing competitive rates and
close help if a ship was damaged on the St. Lawrence section of the Seaway) and with the
support of Kingston federal M.P., E.J. Benson - Minister of Revenue - Sutton had reason to
be both sanguine and frustrated at the same time. Industry opinion favoured his proposal
and the untried route through the St. Lawrence section of the new Seaway provided a
constant stream of damaged ships which his undersized dock could not accommodate: these
casualties provided concrete ammunition for his argument but no business for his troubled
yard. Drawings and specifications were draughted up in 1960-64 detailing the proposed
expansion of the dry dock, which entailed removing the southerly half of the existing
structure, excavating the existing dock bed for extra draft, and extensive dredging of the
immediate harbour easterly from the gate: thus to rebuild at the proposed new dimensions
of 750 feet in length, 90 feet breadth at grade and 76 feet wide at dock bed, with a
working draft of 26 feet. The closure was to be by a pontoon gate. But the capital was not
forthcoming, and only the drawings exist.
Bibliography
Monographs
------ City of Kingston Directory 1906
Greenwood, John. Greenwood's Guide to Great Lakes Shipping. Freshwater Press,
Cleveland: 1990
Muirhead, George. Kingston Dry Dock. Report. City of Kingston Planning
Department, Kingston: 1974
Page, Donald. Original Shipyard Use of Present Marine Museum
Buildings. Unpublished Mss.: 1981
Perkins, M. Ports Annual 1981. Canadian Marine Publications, St. Catharines: 1981
Rushbrook, Audrey. Turning the Historic Kingston Dry-dock into a Maritime Museum.
Marine Museum of the Great Lakes, Kingston: 1977
Wallace, William. Canadian Ports and Shipping Directory . National Business
Publications, Gardenvale: 1956.
Journals
Sessional Papers of the Dominion of
Canada. Queens Printer, Ottawa: 1880, 1889, 1892, 1893
Moorhead, Earl. Murney Point: Its Evolution, Historic Kingston. Kingston
Historical Society, Kingston: 1986.
Perley, Henry. The Dry Dock at Kingston, Transactions of the Canadian Society of Civil
Engineers .v.X. John Lovell Montreal: 1896.
Miscellaneous
National Archives of Canada Finding Aid for
RG 11M.Unpublished Mss. (Hard copy reference for MMGLK Fiche 1982.73.1-51)
Manuscript Sources
QUA Kingston Shipyards Dry Dock Book.
1891-1894(Transcript)
QUA City of Kingston Land Registry Abstract Index. Original Survey Water Lot 29
Microfilm 1544 p.489.
MMGLK Kingston Shipbuilding Company Fonds RG 4 "Letters re. Dry Dock
Extension 1958-1964" 1983.129.10
MMGLK Great Lakes Ship Registry Database
NAC MG 13 W.O. 44/33, W.O. 44/49, W.O. 55/873
Cartographic Sources
Acc# Title
The MMGLK plan collection 1982.73.1-51 is a fiche
copy of original ink on linen drawings held by the NAC; MMGLK accession numbers for the
fiche are given first with NAC references following the titles.
Note: duplicate drawings in 1982.73 collection
are not listed.
The MMGLK plans 1995.45.3-6 are PMTs of plans
held at the NAC; MMGLK accession numbers are listed with the NAC reference following the
text title.
The MMGLK plan collection 1981.2.3746-56 consists
of original linen drawings, their provenance being the Kingston Shipbuilding Company.
Copies of the plans from the Public Record Office
are in the Library Vertical File Marine Railway.
1982.73.1 General Arrangement [Pumps](1890),
Wm.Murdock. NAC RG11
1982.73.4 General Arrangement Main Engines(1890),Wm.Murdock. N.A.C. RG11
1982.73.6 General Arrangement of Auxiliary Engines(1890), Wm.Murdock. N.A.C. RG11
1982.73.8 Arrangement and Setting of Boilers(1890),Wm.Murdock. N.A.C. RG11
1982.73.10 Boilers for Pumping Plant(1890), Wm. Murdock. N.A.C. RG11
1982.73.12 Main Engines.Details(1890), Wm. Murdock. N.A.C. RG11
1982.73.14 Main Engines. Bedplate and Columns(1890), Wm.Murdock. N.A.C. RG11
1982.73.18 Main Engines. Entablature and Pump Bedplate(1890)
Wm. Murdock. N.A.C. RG11
1982.73.19 Main Engines. Details(1890), Wm. Murdock. N.A.C. RG11
1982.73.21 Auxiliary Engines. Details(1890), Wm.Murdock. N.A.C. RG11
1982.73.23 Auxiliary Engines. Cylinders and Pistons(1890), Wm. Murdock. N.A.C. RG11
1982.73.25 Auxiliary Engines. Piston Rods, Connecting Rods and Eccentrics(1890), Wm.
Murdock. N.A.C. RG11
1982.73.27 Auxiliary Engines. Valves, Reversing Levers and Front Columns(1890), Wm.
Murdock. N.A.C. RG11
1982.73.29 Details. [Pumps and Piping](1890), Wm. Murdock. N.A.C. RG11
1982.73.31 [Site Plan](1909)(Collingwood Shipyards)
1982.73.32 [Property Plan](1891), Wm. Murdock. N.A.C. RG11
1982.73.33 Soundings and Borings for New Crib, Also Permanent Points(1918)Corriveau.
N.A.C. RG11
1982.73.34 Extension to Government Drydock(1929), Eugene LaFleur. N.A.C. RG11
1982.73.35 Details of Traveling Crane(1890), Wm.Murdock. N.A.C. RG11
1982.73.36 Section of Schooner Minnedosa [in drydock](1892).N.A.C. RG11
1982.73.37 [Plan of Kingston Showing Power Dry-dock Property](1881), Eugene LaFleur. N.A.C.
RG11
1982.73.38 Sites Being Considered for Proposed Larger Dry-dock (1931), Eugene LaFleur.
N.A.C. RG11
1982.73.39 Arrangement of Boiler Exhaust Pipe(1900), Wm.Murdock. N.A.C. RG11
1982.73.40 Plan of Kingston Dry-dock Premises: Water line 1907 and Waterline as Surveyed
1797(1907), Wm. Murdock, N.A.C. RG11
1982.73.41 Arrangement of Steam Pipes (n.d.), Wm. Murdock. N.A.C. RG11
1982.73.42 Indicator for Hauling Gear (n.d.), Wm. Murdock. N.A.C. RG11
1982.73.43 Floor Plan Engine Room(1890), Wm. Murdock. N.A.C. RG11
1982.73.44 Site Plan(1929),Wm. Murdock. N.A.C. RG11
1982.73.45 Site Plan [Power Dry-dock and Marine Railway](1890)
Eugene LaFleur. N.A.C. RG11
1982.73.46 Replacement of Boilers(1937), Corriveau. N.A.C. RG11
1982.73.47 Replacement of Boilers(1937), Corriveau. N.A.C. RG11
1982.73.48 Plan of Yoke for Caisson(1890), Wm. Murdock. N.A.C. RG11
1982.73.49 Extension to Government Dry-dock.Plan and Profile.(1929)(Canada Public Works)
1982.73.50 Arrangement of Traveling Crane(1890), Wm. Murdock. N.A.C. RG11
1982.73.51 Section of Schooner Bangalore: Keel and Bilge Blocks(1892), Wm. Murdock.
N.A.C. RG11
1995.45.3 Engine Bldg. West Elevation.(1890)(N.A.C. RG 11)
1995.45.4 Engine Bldg. South Elevation.(1890)(N.A.C. RG 11)
1995.45.5 Engine Bldg. West Elevation.(1890)(N.A.C. RG 11)
1995.45.6 Dry Dock. Site Plan. Plan, Cross Section, Longitudinal Section, Elevation,
Caisson, Boiler House Plan(1896), Henry Perley. Transactions of The Canadian Society of
Civil Engineers V.X 1896
1981.2.3746 Dry Dock. Section for Proposed Extension.(1953), Kingston Shipyards [hereafter
KSY]
1981.2.3747 Plan of Government Dry-dock as Extended (n.d.), KSY
1981.2.3748 Dry Dock Plan and Sections(1939),KSY
1981.2.3749 Arrangement of Dry Dock at Gate End(1951),KSY
1981.2.3750 Dry Dock as Extended(1944),KSY
1981.2.3751 Dry Dock Borings at Entrance(1957),KSY
1981.2.3752 Arrangement of Dry Dock at Gate End(1959),KSY
1981.2.3753 Caisson Well of Dry Dock (n.d.),KSY
1981.2.3754 Proposed Dry Dock Extension(1960),KSY
1981.2.3755 Proposed Dry Dock Extension(1960),KSY
1982.2.3756 Proposed Dry Dock Extension(1963),KSY
----------- Sketch of the Battery at Mississauga, Kingston showing in Yellow the Repairs
by the Royal Engineer Department for the Purposes of Placing it in a Secure and Defensible
Position. 23 Apr.1838. PRO. WO 55/873 p.448
------------ [Kingston Harbour Depicting Marine Railway] 27 March 1839. MPH 891/1 p.2503
Numbers e.g. 1982.2.3755 are known as Accession
numbers (Inventory location numbers)

| Home Page |
Marine Museum |
Alexander Henry |
Bed & Breakfast |
Pump House | Tea Room |
|
Gift Shoppe | Site Rentals |
Hours of Operation &
Admission Prices |
|
Membership |
People | Upcoming Events |
Publications
| Research |
Boat Pro |
| Maritime Heritage Centre | World
Links
|
Quick List |
Contact
Us |
Marine Museum of the Great Lakes at Kingston
55 Ontario Street, Kingston, Ontario. K7L 2Y2
Phone: 613 542 2261 Fax: 613 542 0043
E mail: marmus@marmuseum.caWeb
site: http://www.marmus.ca